Our Projects

We Will Satisfy You With Our Expertise

new4

CHURCH POINT​

Client engaged Tricastle group , for excavation and concrete works of a high end home in North Sydney.The work consisted excavating , installing and maintaining a site access which was high up on a hill.The job required a continuous pile wall with shotcrete and capping beam along the properties back and side boundaries,Excavation for an in ground pool, form Reo and poor the in ground pool .Excavation for the properties footings, form , Reo and pour the properties footings and slab. Form Reo and pour of first and second floor slabs. The builder also required tricastle group for some hard landscaping works which called for tight and tricky excavation work up a 45 degree slope,Excavate and build Seven tired retaining walls Excavate and pour Footings and slab for a two car garage Excavate and pour Concrete stairs from the road to the house . And excavate , pier and pour, Piles and caps for an outdoor escalator,

a

Chiswick Job​

TriCastle Group was commissioned by a discerning client in Chiswick, New South Wales, to undertake the excavation and construction of an in-ground basement. The project involved a meticulously coordinated series of tasks, including the demolition of an existing structure, site clearance and grubbing, piling and capping beam installation, as well as precise excavation work to create the basement structure. Tricastle Civil Construction Group was further contracted by the client to carry out the excavation, formwork, reinforcement, and concrete pouring for the footings and slab of a two-car garage. TriCastle Group collaborated closely with electricians and plumbers to excavate, install, and lay conduits for their respective service runs.

WhatsApp Image 2024-05-25 at 2.25.30 PM

cammeray Job

Our team undertook a comprehensive civil construction project in Cammeray, focusing on the development and enhancement of local infrastructure. The project involved the meticulous planning and execution of several key components, including roadways, drainage systems, and pedestrian pathways. Our primary objective was to improve the connectivity and safety of the area while minimizing disruption to the daily lives of residents. We began with a thorough site assessment and collaborated closely with local authorities to ensure all plans were compliant with regulatory standards. By leveraging state-of-the-art technology and sustainable building practices, we successfully completed the road widening and resurfacing, which significantly alleviated traffic congestion and enhanced the overall flow of vehicular movement.

CHURCH POINT​

Chiswick Job​

CAMMERAY JOB​

Newsletter
© Copyright 2024 Tricastlegroup - All Rights Reserved